Monday, March 13, 2017

Dorney Park New For 2017 March Project Update - Part 1


We've got a nice treat for everyone this week as Dorney Park was kind enough to have us by the park to take a look at all the projects currently underway for the 2017 season. 

2017 will be a pretty big year for the park in terms of capital expansion additions with two new rides, a huge catering area, a new show, several food changes in both parks, Wildwater Kingdom improvements and more.  So much in fact that this update will have to be split into two parts!  So let us wait no more and let's go ahead and dig in!


Parkside Pavilion is a major capital project that will give the park a high-capacity, modern, comfortable and rather nice catering facilities for its guests.  We first heard of the park's plan for the addition almost two years ago, and now the build is underway and it's going to be quite impressive when done.

© Dorney Park
For those who want a refresher, here is how the finished Parkside Pavilion will look.  There are basically three pavilions in the project, two large ones on either end and a middle one with both seating and a large kitchen.  At this point more than half of the structures are up, which we can look at in detail below.

© NewsPlusNotes
This photo was taken from just outside the entrance of Blood on the Bayou, showing a large part of the pavilion that is not yet standing.  To the left of this photo are completed structures, and in the coming weeks the dirt seen here will quickly turn into more completed buildings.  You can see the defined outline of the area (and how large it is) via the concrete footings already poured.

© NewsPlusNotes
Taken from the same spot, this image is zoomed in on the already standing structures.  Most of what you can see here is the middle pavilion, which does offer seating but also holds a large chef's kitchen area - more on that later.

© NewsPlusNotes
The main entrance to Parkside Pavilion will be past the entrance to Hydra, back around Meteor where the existing restrooms are.  You can see those restrooms in this photo, they're getting a bit of a spruce-up as part of the larger project.  Guests will head to the left of the restrooms to formally enter the pavilion area.  There will be a large entrance sign in the foreground of this photo, helping guests know where to go.

© NewsPlusNotes
And the sign will look an awful lot like this, because this is it being fabricated by Dorney Park's talented graphic services team.  The cap-piece on the left will hold the sign on the right, once it has its lettering of course, and actually be removable should the need for large equipment to pass through the area.  You have to think of everything when you run what is essentially a small city of its own, as the park pointed out to me.

© NewsPlusNotes
As guests come around the restrooms they are greeted by the expansive Parkside Pavilion stretching out in front of them.  The park already has the first large section completely covered (the snow was obscuring the final roof colors here), as well as the middle area - if you look close you can see the break in the structure.  As said before, a large third section will be located way in the back of this photo.  Photos do not totally show just how massive the buildings are.

© NewsPlusNotes
Also as guests enter the area they're going to have some neat views of Hydra, Steel Force, and the lake below.  This temporary fencing allows a clear view to the track below, but even when the final fence goes up the views will still be impressive.

© NewsPlusNotes
Stepping inside the first large pavilion we start to get a feel for the size of these structures.  And what you see above is only half of just the first building!  There's a duplicate section to what you can see above on the other side of the middle building with the white paper coating on it.  That center section will be where self-serve refreshments can be obtained.

© Dorney Park
I realized after I took the above photo that it was pretty comparable to this concept art of Parkside Pavilion that Dorney Park released last fall.  You can see the center beverage area that I referenced before, and how the serving areas will be set out.  The pavilion features high ceilings that will be complete with modern lighting and fans.  When finished, the area will have a very comfortable feel to it, especially when compared to the existing catering pavilions.

© NewsPlusNotes
In the middle of the center pavilion is a large chef's kitchen, which is pictured above.  Obviously right now there isn't a lot in here, but when complete there will be all the required kitchen items for the park to make a huge variety of dishes.  Those looking to book an event at Parkside Pavilion will be able to choose from much more than just the usual burger, hot dog and chicken menu.  But of course, those classics will also be offered.

© NewsPlusNotes
This is a shot of the seating area in the middle pavilion, with the chef's kitchen area inside the wall on the left of the photo.  The cut-out area in the wall will be another self-serve refreshment area for guests.  Another plus of the Parkside Pavilion is that they will have movable walls that will allow the large areas to be subdivided to give groups a more private feel, regardless of their size.

© NewsPlusNotes
There will be a bit of open space between Parkside Pavilion and both White Water Landing and the building seen above, which holds Haunt attractions - currently Blood on the Bayou.  In this space will be a 'presentation area,' not a formal stage but something that groups can use if they have an award ceremony or something similar.  This section will be worked on more when the main structures are all standing.

© NewsPlusNotes
One last photo from the pavilion expansion, this is the far corner of the development that shows the elevation change that takes place in the area.  There's a service road down below that gives the park access to Hydra.  It took a significant amount of concrete to be able to get the job done, but it will be well worth it when this expansion is complete.


Another new project for 2017 is the addition of Cirque Imagine in the park's Good Time Theater, located just inside the park's main entrance.  This popular show has already played at several other Cedar Fair parks and become a huge success for them.

© NewsPlusNotes
There is still a lot of work to go before the show is ready to open, though all the set pieces are already in the theater.  A lot of assembly required, however.  Above is a photo of one of the main performance pieces that has multiple levels for performers to use.  In other variations of the show it is common to see cyclists way up on the top level, for instance.

© NewsPlusNotes
Cirque Imagine will feature "high-flying acrobatics, feats of strength, raw athleticism, beauty, grace and sidesplitting humor," according to the official park description.  The acts will take place in front of, and on top of, uniquely lit set pieces, some of which are seen above.  Like I said, plenty of assembly still required though!  Cirque Imagine is set to open in June.


One of the two new rides opening in 2017 is Kaleidoscope, located on the Main Midway next to the Coasters restaurant.  The twirling flat ride will have an amazing lighting package that, at night, will make a kaleidoscope of color - hence the name.

© Dorney Park
For another refresher, this is the original concept art released by the park.  Kaleidoscope is a "classic" flat ride, a Huss designed Trokia.  The ride was obtained as a part of Cedar Fair's hunt that went across the globe in search of popular family rides that aren't found in North America as frequently as they used to be.  Dorney Park's Trokia is coming from Europe, where it traveled on the fair circuit.  It will be fully refurbished before it is installed and opened.

© NewsPlusNotes
Here is the current progress on Kaleidoscope - this photo was taken from just at the edge of the Coasters dining patio.  This plot of land used to be home to the Screamin' Swing, which all traces of have been removed except for the service building in the back.  The park has been working on installing a permanent foundation for the ride, and also has the operator booth standing.

© NewsPlusNotes
To give an idea of the ride's location, here is another photo showing the Main Midway behind the construction site.  Kaleidoscope was able to fit in with just the removal of the temporary stage that was next to Coasters - the locker structures in the far end of this photo (and the trees!) will be able to remain.

© NewsPlusNotes
Walking down the midway a bit and then turning backward at the work site.  Trokias are fairly large flat rides, so I'm pleased to see how the park was able to fit it in this space so nicely.  The queue for Kaleidoscope will be adjacent to the Coasters dining patio, on the left side of the ride.

© NewsPlusNotes
Finally, one last photo for this first part of the overall update.  The free standing game building that is located in the middle of the main midway area (near Talon) will no longer have games in 2017.  Instead, it is being converted into a Coca-Cola Refresh Station.  With the emergence and popularity of all day and all season beverage plans, there is additional need for these facilities in the park - and this location will be able to handle plenty of guests.  It's also a great physical location, sandwiched in a very busy dining area and also in between both of the park's new rides.

Stay tuned for the second half of the update later this week!


Saturday, March 11, 2017

Additional Joker Free Spin Coaster Updates from Six Flags


There will be a total of three new Joker free spin coasters opening at Six Flags parks in 2017, and we've already seen that the instillation at Six Flags Over Texas is complete.  But how about the other two?  Well, they are moving along quickly as well.


Six Flags Great America just topped off their new Joker coaster a few weeks ago, marking the end of vertical construction on the new ride.  The park shared the above video from the occasion, showing more views of the Joker in its new home.  The ride will be located in the Yankee Harbor themed area at Six Flags Great America.

© Six Flags New England
Six Flags New England is the third park that will open a Joker coaster this year.  They are still actively building the coaster, sharing the above photo just today.  There's still plenty of ride left to be put up, but wow how those colors pop!  The Joker will be located in the park's South End area, not too far away from their Batman themed ride.

All three of the new rides will send passengers on a trip that starts with a 120 foot vertical lift, followed by a series of undulating track elements and vertical drops that make the cars flip riders along the way.


Thursday, March 9, 2017

Brand New "VR Showdown in Ghost Town" Opening at Knott's Berry Farm in April


Knott's Berry Farm and VRstudios are teaming up to present the first "permanent installation of a free-roaming, multi-player VR experience in a U.S. theme park," which will open at the park in April.  Known as VR Showdown in Ghost Town, the experience will be designed to fit in with the story of Knott's Ghost Town themed area and will be available exclusively at Knott's Berry Farm.

© Knott's Berry Farm
VR Showndown in Ghost Town will be created inside the park's Boardwalk Arcade.  Groups of players will time travel to a futuristic version of Knott's famous town of Calico, where robotic creations are trying to take over.  The teams will have to work together to defend the town through competitive gaming, as they will be armed with virtual reality headsets and "futuristic blasters" to get the job done.  Players will compete for the highest score during the adventure, both individually and as a team, and have goals to complete.

“We are always looking for new and exciting ways to entertain our guests,” said Christian Dieckmann, Cedar Fair’s Vice President of Strategic Growth. “By using a free-roaming system, we can take full advantage of the capabilities of VR and let our guests be the stars of the show. A majority of people have not yet experienced VR, and we anticipate there will be a lot of interest from guests to have their first taste at our park.”

VR Showdown in Ghost Town will have a fee of $6.00 for participants.  To read more, check out the official Knott's website.


Wednesday, March 8, 2017

NBCUniversal To Become Sole Owner of Universal Studios Japan


Last week it was announced that NBCUniversal, owned by Comcast, will be purchasing the rest of Universal Studios Japan to become its sole owner.  The deal, which is expected to close in April, is valued at $2.3 billion - a very large sum but Universal Studios Japan is also a heavily attended and very successful theme park.  It first opened in 2001 and has seen growing attendance in recent years, including a large increase when its Wizarding World of Harry Potter opened.

NBCUniversal has been investing heavily in their Universal-branded theme parks in recent years, seeing great returns on the investments and growing profits.  To that end, it is not really a surprise that they want to own all of Universal Studios Japan.  The park is currently owned by several partners, including investment firms and even the property's former CEO - together they own 49% of the resort, which NBCUniversal will be purchasing.

“Universal Studios Japan is an amazing and incredibly successful theme park,” said Tom Williams, Chairman and Chief Executive Officer for Universal Parks & Resorts. “This acquisition will bring an even stronger future for the theme park, its guests and its team members. We are thrilled USJ will fully be part of the Universal family and look forward to continuing to create a remarkable experience for our guests.”

NBCUniversal is currently building a branded theme park in Beijing and already licenses its name (but does not own) Universal Studios Singapore.  As the theme park market continues to grow in Asia, I wouldn't be surprised to see continued expansion in this direction.

Universal Studios Japan will open a new Minion Park themed area in April, including the popular Despicable Me: Minion Mayhem attraction.  It has also announced the first Nintendo themed area to open in time for the 2020 Tokyo Olympics.


Monday, March 6, 2017

Fun Spot America's Mine Blower Starting to Take Shape


© Fun Spot America
Fun Spot America, located in Kissimmee, Florida, has been making great progress on Mine Blower, a brand new custom-design wooden roller coaster from The Gravity Group.  Mine Blower features steel supports, painted white, that make for a nice contract against the traditional wooden track.  Photos released by the amusement park today show how much of Mine Blower is already standing - the ride is going up quick!

The above ground-level photo shows the turn out of the station and onto the lift on the left-hand side, and over on the right is a part of what a believe is a double-down element that takes place in the first third of the ride.

© Fun Spot America
Fun Spot America also gave us a treat and took to the skies to get some aerial photos of Mine Blower's construction.  The coaster will cross over itself many times, so the park is starting the construction with the center 'guts' of the ride first.  The cross section that has been completed will be fully buried with track above it once the ride is finished.

© Fun Spot America
Highlights of Mine Blower will include a 82 foot tall lift hill, top speeds of 49 miles per hour, an over-banked turn at 115 degrees and a corkscrew inversion that happens over top of the ride's station.  Total track length that the two, six car trains (for a total of 12 passengers) will travel is 2,256 feet.  Looking forward to seeing even more of the ride go up - it looks like some very tall lift hill bents are on the ground and going up soon!


Sunday, March 5, 2017

Premier Rides' Designed "Hype" Going up at Särkänniemi


Despite freezing cold temperatures in Finland, crews are working steadily to build Hype at Särkänniemi Amusement Park.  The triple-launch roller coaster was kept a closely guarded secret until just recently, when the park started to put the ride's steel pieces together.

© Premier Rides
Hype is one of Premier Rides' Sky Rocket II designs, known for its 150 foot tall heartline roll and multiple launches.  The coaster's train is first launched forward up to about 50 feet, then after falling backward it is launched again backward up to about 100 feet in the air.  The train then is launched through the station a third time where it turns 180 degrees as it heads up to the 150 foot high point (seen in the photo above).  The trains then move through a slow heartline roll, a vertical drop and a non-inverting loop element.

“All of us at Premier Rides are so honored to have teamed up with Särkänniemi to deliver an amazing roller coaster,” commented Jim Seay, president of Premier Rides. “Hype incorporates our newest technologies including our most advanced magnetic launch system that will create the Nordic Region’s first triple-launch experience and the highest inversion in the region as well!”

Seay added, “Premier is especially proud that the ride is already going vertical and will be able to open on schedule which will allow thrill-seekers to see what the Hype is all about! Exceeding expectations means a lot to Premier!”

Hype will be the first major new roller coaster at Särkänniemi in more than a decade and is the single largest project they have ever completed.